GE 9HA
The 9HA high efficiency, air-cooled gas turbine is an industry leader among H-class offerings, and now the 9HA.01 is at the heart of the world's most efficient combined-cycle power plant . With two available models—the 9HA.01 at 429 MW and the 9HA.02 at 519 MW—customers can easily select the right capacity to meet their generation needs. INDUSTRY-LEADING OPERATIONAL FLEXIBILITY Features a fast 12-minute ramp-up from start command to full load, and up to 70 MW/minute ramping capability in a 1x1 configuration or 140 MW/minute in a 2x1 configuration. LESS COMPLEX H-CLASS OFFERING Showcases a simpler configuration than GE’s previous H-class fleet and doesn’t require a separate cooling air system. VALIDATED AND PROVEN The 9HA has undergone a full-speed, full-load validation test at our Greenville, SC facility in 2015 and exceeded engineering performance expectations. 9HA.01/.02 Gas Turbine The world's largest and most efficient heavy-duty gas turbine. T...