Wednesday, December 10, 2008

SEMINES GAS TURBINE SGT5-2000E (50Hz)



The SGT5-2000E is an extremely well-proven machine for simple or combined-cycle processes with or without combined heat and power, and for all load ranges, particularly peak-load operation.
For Integrated Coal Gasification Combined Cycle (IGCC) applications we offer our SGT5-2000E(LC) machine.

The SGT5-2000E has a record for toughness and durability with more than 120 units in operation accounting for approximately 70,000 starts and more than 4,000,000 operating hours.

TECHNICAL FEATURES:-


> Horizontally split casing
> Two walk-in combustion chambers for hot-gas-path inspection without cover lift
> Combustion chambers lined with individually replaceable ceramic tiles
> 16-stage axial-flow compressor with variable-pitch inlet guide vanes
> Optional fast inlet guide vanes for peak load operation and frequency stabilization
> Four stage turbine
> All blades removable with rotor in place
> Hybrid burners for premix and diffusion mode operation with natural gas, fuel oil and special fuels such as heavy oil and refinery residues
> Low-NOx combustion system

> Power Output
168 MW

> Efficiency
34.7 %

> Heat Rate
10.366 kJ/kWh
9.825 Btu/kWh

1 comment:

James Coffey - Weir said...

I am looking for an engineer to pervide maintenanc services for this model of machine. Do you know anyone available on a contract basis for work in the Middle East? please advise. james.coffey@weirservices.com